The Boiler Room has already finished , and the Foundation has also been built. Then, 20T Thermal Oil Boiler Boiler Boy was Installed above the Fundation .

After the boiler body was in site, finish the Insulation meterial for the boiler body.

Then, begin to install the Multip Tube Dust Cleaner.
Install the Water Film Dust Cleaner .
Install the Pipes . 
Install the Fuel Feeder. 
Install the I.D Fan. 
Check the Installation .